Manufacturing & Industrial

DiGesare Mechanical has completed a vast variety of manufacturing and industrial facilities. Major corporations such as General Electric, Albany International, Schenectady Chemicals and the Golub Corporation have awarded us repeated projects based on our competitive pricing, quality management supervision and resources. We have experience that ranges from ultra fine tolerances and precision environments of high tech to the pristine conditions demanded by food and drug manufacturing. These projects require the ability to work within challenging schedule restraints, utilizing progressive planning, scheduling and expediting practices.


image.jpeg

General Electric Corporate Research Center

General Construction, Plumbing, HVAC & Fire Protection
DMI Contract – 2.6 Million

DiGesare Mechanical is proud to have performed numerous repeat projects for this Fortune 500 client. Having earned GE’s respect and confidence in the mechanical field, General Electric asked us to GC their mufti-phased Indoor Air Quality 2000 Project for which we were happy to oblige.

For this ongoing multimillion dollar interior reconstruction undertaking DMI’s contract responsibilities include all phases of construction including site work, structural steel, roofing, drywall, concrete, asbestos removal, electrical, painting, carpets and finishes as well the plumbing and HVAC work. A painstakingly prepared phased schedule facilitated the interior construction and permitted the project to progress with minimum impact on the ongoing day-to-day process of GE’s research and development division.

image.jpeg

Albany International Felt Manufacturing Plant and Corporate Offices

Plumbing, Process Piping & HVAC
DMI Contract – 2.6 Million

This project consisted of a 210,000 square foot manufacturing plant, providing a state of the art environmentally controlled facility for the production of pressing cloth fabric for the papermaking industry.

In addition to the manufacturing plant’s process piping and mechanical requirements, DMI was also responsible for a design/ build plumbing and HVAC system for a multi-million dollar 38,000 square foot attached office building which serves as administrative space for operations as well as a complete analytical lab for research, development and quality control.